Well that's news to me. It was my thinking that MS4s wouldn't have to do much in the way of controlling construction site stormwater pollution because there's already a permit in place for construction-related stormwater.
In fact, MS4s are required under the new MS4 general permit to write an ordinance that holds developers/contractors to task for stormwater/litter controls at their construction sites. Specifically:
- An ordinance that makes BMPs sediment and erosion control necessary at construction sites that disturb over an acre (including ones less than an acre if they're part of a larger development)
- An ordinance that requires construction sites to control waste/litter
- Procedures must be in place for reviewing construction site plans, citizen complaints and for making site inspections.
No comments:
Post a Comment